On a typical project, one contractor calculates the concrete footing, another supplies the steel structure, and a third installs it — with no single party responsible for how the two connect.
PILLAR calculates the ground screw and the column against the same geology and the same load case, manufactures both, and delivers them as one package.
The result: no concrete works, foundation installation measured in days rather than weeks, a structure that can be fully removed and reused, and one engineering team accountable for the full load path — from screw to roof.
Rimini — one of Italy’s key renewable-energy events.
Meet the engineering team in person before you order.
Recognised at KEY, Rimini, for an engineering solution contributing to the energy transition.
Seeing our engineering solutions come to life. Reliable ground-mounted solar structures installed across Italy.
Verification under NTC 2018 by a licensed Italian engineer is arranged with the client’s design team
Czech Republic — 100 MW, structures and ground screws supplied by PILLAR
Full production cycle — cutting, bending, welding, galvanising, quality control. Plants in Uzhhorod and Dnipro, with OEM capacity in Turkey under PILLAR’s technical supervision. Steel from ArcelorMittal and POSCO.
Structural concept, screw type and length, BoM, drawings scope and budget.
Own plants — 10,000 t of steel and 500,000 ground screws per year, welding to EN 1090.
Delivery to your Italian site, installation supervision or full installation by our crews.
Send a layout — we confirm feasibility and foundation type at no cost.
Same working day
Within 72 hours
No follow-up pressure
Or call / WhatsApp our Italian-speaking manager: +39 00 000 0000 / +420 000 000 000
No. PILLAR supplies the steel mounting structure and the foundation, compatible with any PV module and adapted to your module configuration.
Yes, on request: installation supervision or full installation by PILLAR crews. Ground screws are installed with one machine and minimal excavation, typically in 8-12 minutes each, depending on ground conditions, screw dimensions, equipment and site access.
Our steel structures are produced in accordance with EN 1090 under factory production control and are hot-dip galvanised. Production is EN 1090-1/2, ISO 9001 and ISO 3834 certified.
We design the foundation for each site from your geotechnical data and structural loads. The ground screw and the structure are engineered as one system against the same geology and load case. The site-specific structural report covers snow, wind and seismic loads according to Eurocodes, and the final foundation type is selected according to the geotechnical data.
DAP delivery to your site in Italy, with all customs formalities handled by PILLAR. Stock items ship from our EU warehouse in the Czech Republic. The lead time is confirmed in the quote.
We provide a structural calculation report, foundation design, drawings, BOM and assembly manual for Italian review. Verification under NTC 2018 can be coordinated with a licensed Italian engineer appointed by you or your design team.