Design and installation of solar
power plants in Kyiv, Kharkov, Dnipro, Odessa, Nikolaev, Lvov, Zaporozhye and other cities of Ukraine.
Ground screws are increasingly used installing solar power station. The main benefit of such screws is that the generation of electricity can start in 2 days, and not in 15-30 days as with a concrete base.
In addition to the production of ground screws for solar power stations, PILLAR also manufactures metal structures for it. Such a frame for solar panels suits well to ground screws for assembly and has high reliability, durability and stability.
The company PILLAR designs foundations for solar panels as for solar power stations, prepares the foundation drawings and calculates the foundation for both solar power stations and solar panels. Drawing design of a foundation for solar panels and solar power station is also included in our services.
One ground screw is installed in up to 15 minutes. You can start the construction of the building immediately after finishing with ground screws. Foundation of the house on the ground screws does not require shrinkage, because after screwing up the soil is compacted and as a result the soil is capable of supporting the weight of the house.
The possibility of mounting on sites with a complex landscape or on a slope, where the concrete foundation requires enormous labor and financial costs.
It is possible to install the foundation within several days. Involvement of complex construction equipment and excavation as concrete works are not required.
Galvanized piles are practically not corroded, which allows its use in water-saturated soils and even in reservoirs.
Installation of the ground screw foundation is carried out using a mode, in which there remains a minimum of construction waste at the end of the work.
Compared to strip foundations, the pouring of it in winter time requires additional costs bound on thermal insulation of concrete. The installation of ground screws can be done in the normal operating mode.
In order to get optimal solution for the construction of the foundation the customer must provide a geological survey of the site and provide a construction project. Considering these data experts make conclusions about the properties of the soil and the loads of the future construction.
Based on the data obtained our engineers prepare a calculation of the required number of screws and the distance between them, as well as the depth of it’s immersion. Depending on the collected loads for the foundation of the house, the optimal diameter and required length for ground screws are selected.
Screw foundations for low-rise buildings are installed in a short time. Depending on the complexity of the object, there are three options for screwing in: manual, electromechanical and hydraulic. After the ground screws have been installed at the required in design depth, the headstrap is strapped.
Metal structures for above-ground solar stations with a book orientation of panels 1650×992 or 1950x992mm with a foundation made with ground screws.
We chose PILLAR for the reason that they have a different design with ground screws under the tables. It is exclusive and almost never used in solar energy. PILLAR is a company of professionals who keep their word and do everything on time. Supply of materials and installation all at a professional level. We had a good impression, we look forward to further cooperation. To build not 5 MW, but so that our bill goes to tens.
Avenston Company: Industrial solar power plants.
Get advice on the design, production and installation of ground screws