When choosing a foundation for a house of gas concrete you have to keep in mind that the foundation for such houses should retain the shape of the house that was originally set in the project.
The most suitable foundation for gas block houses is the foundation on ground screws.
The ground screws for houses made from the gas concrete are easy to install. The screw foundation for gas concrete houses is the most matching option for building such houses on heaving soils and steep slopes, because such a foundation does not require complex excavation and concrete work, protection the concrete against water, leveling the site. All this greatly simplifies the installing of a foundation.
PILLAR compiles a project for the foundation of a gas concrete house, prepares drawings of the foundation for these houses and calculates the foundation for such a house. Our services also include design the foundation for a gas concrete house.
Ground screw foundation for hydraulic works can save up to 93% of time compared to the traditional foundation.
The minimum amount of additional building materials and equipment. Convenience of delivery to the construction site. Minimum risk of violation the technology.
The foundation on ground screws can be installed regardless of the season and weather conditions. At the same time, in winter it is even easier to build this foundation, since the piles can be mounted from the ice without installing pontoons.
Galvanized piles are usually not corroded which enables its use in water-saturated soils and even in reservoirs.
Installation of the ground screw foundation is carried out using a mode, in which there remains a minimum of construction waste at the end of the work.
Such feature of installation of ground screws allows to use them even in difficult situations when installation of the concrete foundation is impossible.
In order to get optimal solution for the construction of the foundation the customer must provide a geological survey of the site and provide a construction project. Considering these data experts make conclusions about the properties of the soil and the loads of the future construction.
Based on the data obtained our engineers prepare a calculation of the required number of screws and the distance between them, as well as the depth of it’s immersion. Depending on the collected loads for the foundation of the house, the optimal diameter and required length for ground screws are selected.
Screw foundations for low-rise buildings are installed in a short time. Depending on the complexity of the object, there are three options for screwing in: manual, electromechanical and hydraulic. After the ground screws have been installed at the required in design depth, the headstrap is strapped.
Get advice on the design, production and installation of ground screws