SIP-PANEL HOUSES

Design and installation of pile foundations
in Kyiv, Kharkov, Dnipro, Odessa, Nikolaev, Lvov, Zaporozhye and other cities of Ukraine.

Screw foundation for SIP-panel house

Thanks to the excellent thermal insulation, simple installation and environmental friendliness, SIP-panel houses are widely spread all over the world. In the summer such houses perfectly keep a cool and in the winter – heat.

SIP panels consist of two OSB boards at front and back and polystyrene foam between them. Because of the closed pores and the air in them, polystyrene foam retains heat or cool well. This structure makes it a good insulation.

The house of SIP-panels on ground screws is energy efficient and fire resistant. The SIP-panel with a thickness of only 120 mm has the same energy efficiency as brickwork with a thickness of 2.5 m or reinforced concrete with a thickness of 4.2 m. OSB slabs are treated with fire retardant. The material treated with this substance becomes fire resistant and acquires the ability to self-extinguish.

ADVANTAGES OF THE HOUSE FOUNDATION ON GROUND SCREWS

Installation of the foundation in 48 hours

One ground screw is installed in up to 15 minutes. You can start the construction of the building immediately after finishing with ground screws. Foundation of the house on the ground screws does not require shrinkage, because after screwing up the soil is compacted and as a result the soil is capable of supporting the weight of the house.

Solving relief problems

The possibility of mounting on sites with a complex landscape or on a slope, where the concrete foundation requires enormous labor and financial costs.

Easy installation

It is possible to install the foundation within several days. Involvement of complex construction equipment and excavation as concrete works are not required.

No water impact

Galvanized piles are practically not corroded, which allows its use in water-saturated soils and even in reservoirs.

No garbage at the construction site

Installation of the ground screw foundation is carried out using a mode, in which there remains a minimum of construction waste at the end of the work.

The possibility of installation in cold season

Compared to strip foundations, the pouring of it in winter time requires additional costs bound on thermal insulation of concrete. The installation of ground screws can be done in the normal operating mode.

STAGES OF INSTALLATION

Geological survey and construction project

In order to get optimal solution for the construction of the foundation the customer must provide a geological survey of the site and provide a construction project. Considering these data experts make conclusions about the properties of the soil and the loads of the future construction.

Foundation adaptation

Based on the data obtained our engineers prepare a calculation of the required number of screws and the distance between them, as well as the depth of it’s immersion. Depending on the collected loads for the foundation of the house, the optimal diameter and required length for ground screws are selected.

Installation

Screw foundations for low-rise buildings are installed in a short time. Depending on the complexity of the object, there are three options for screwing in: manual, electromechanical and hydraulic. After the ground screws have been installed at the required in design depth, the headstrap is strapped.

Contact us

Get advice on the design, production and installation of ground screws

To get a consultation, leave your contacts