Terraces
on ground screws

Design and installation of pile foundations
in Kyiv, Kharkov, Dnipro, Odessa, Nikolaev, Lvov, Zaporozhye and other cities of Ukraine.

How to assemble yourself

Terrace kits are very easy to assemble on your own. The kit is delivered to the site completely ready for assembly, you just need to assemble the terrace as a constructor.

To begin with, prepare the site for screwing the ground screws by making small holes at the screwing points. For convenience, we will provide you with a special wrench for self-driving geoscrews.

After all geoscrews are screwed in, we need to install racks in them and tighten them with bolts. Pay attention to the number of holes in the rack, how many modules will be installed on it. So in the corner posts there is 1 hole, in the side posts 2, and in the inner posts 4.

Support beams are installed on top of the racks and bolted to the racks. Then you need to install the clamps on which the logs will be fixed. After all the lags are mounted, we can install the terrace board.

Advantages of terraces on screw piles

Time saving

Ground screw foundation for hydraulic works can save up to 93% of time compared to the traditional foundation.

Convenience and simplicity

The minimum amount of additional building materials and equipment. Convenience of delivery to the construction site. Minimum risk of violation the technology.

All seasons

The foundation on ground screws can be installed regardless of the season and weather conditions. At the same time, in winter it is even easier to build this foundation, since the piles can be mounted from the ice without installing pontoons.

Not damaged by water

Galvanized piles are usually not corroded which enables its use in water-saturated soils and even in reservoirs.

No garbage at the construction site

Installation of the ground screw foundation is carried out using a mode, in which there remains a minimum of construction waste at the end of the work.

No noise and no vibration

Such feature of installation of ground screws allows to use them even in difficult situations when installation of the concrete foundation is impossible.

STAGES OF INSTALLATION

Geological survey and construction project

In order to get optimal solution for the construction of the foundation the customer must provide a geological survey of the site and provide a construction project. Considering these data experts make conclusions about the properties of the soil and the loads of the future construction.

Foundation adaptation

Based on the data obtained our engineers prepare a calculation of the required number of screws and the distance between them, as well as the depth of it’s immersion. Depending on the collected loads for the foundation of the house, the optimal diameter and required length for ground screws are selected.

Installation

Screw foundations for low-rise buildings are installed in a short time. Depending on the complexity of the object, there are three options for screwing in: manual, electromechanical and hydraulic. After the ground screws have been installed at the required in design depth, the headstrap is strapped.

Work examples

Terrace under the cafe in the village Koblevo

Ground screw foundation for 3 log cabines in Koblevo

Public terrace in sarzhin yar park, Kharkiv city

Foundation for light-frame houses on water