Design and installation of pile foundations
in Kyiv, Kharkov, Dnipro, Odessa, Nikolaev, Lvov, Zaporozhye and other cities of Ukraine.
Installation of wind turbines should be finished using environmentally friendly materials that do not harm the environment.
The basement of wind turbines is installed on sets of ground screws, which consist of many ground screws set in soil. This foundation is stable and highly reliable.
In addition ground screws for wind turbines have a number of other advantages:
Ground screw foundation for hydraulic works can save up to 93% of time compared to the traditional foundation.
The minimum of additional building materials and equipment. Convenience of delivery to the site. Minimum risk of breaking the technology.
Ввиду специфики затвердевания бетона, его заливка в холодное время года в естественных условиях невозможна. Фундамент на геошурупах может устанавливаться, независимо от времени года и погодных условий.
Monolithic foundation can be mounted only on solid, stable ground. The foundation on ground screws is easily installed on watered soils.
Such feature of installation of ground screws allows to use them even in difficult situations when installation of the concrete foundation is impossible.
Before designing a foundation we need to get from the customer data from a geological survey of the plot of land and to get a project of a future construction. If the customer still misses any of required data we help him to make the required documentation together with our proven partners in a shortest time.
A very important stage before realization of a project is drawing a design. The ground screws and joints in foundation for power transmission towers are usually made due to project specific drawings. These ground screws are able to fulfill its task correctly.
Screw foundations for power transmission towers are installed in a short time. First of all there are set ground screws and afterwards the basement constructions of the future building are installed. The finishing of ground screws for industrial buildings including hangars takes usually several days.
Get advice on the design, production and installation of screw piles