Home / Communication masts

COMMUNICATION MASTS

Reliable foundation for communication masts with predictable bearing capacity and stable geometry. Screw foundations provide an engineering basis for telecommunication masts and towers without concreting, shrinkage and long process pauses.
FULL ENGINEERING CYCLE FROM PILLAR
From the idea to the finished solution!

Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.

From the idea to the finished solution!

Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.

Engineering design of foundations on screw piles taking into account the geology of the site, design loads and project requirements. We perform selection of the type, diameter and depth of geo-groups, providing accurate geometry of the foundation field and reliable operation of the base.
Own production of geo-groups with quality control at each stage - from steel selection to anti-corrosion protection. The products meet the design loads, durability requirements and operating standards of foundation systems.
Professional installation of geo-groups in compliance with project geometry and torque control. Foundations are installed without concreting and unnecessary excavation work, which allows to reduce the implementation time and optimize costs.

SCREW FOUNDATION FOR COMMUNICATION MASTS

Communication masts

High-rise structures that receive significant vertical, horizontal and wind loads, as well as dynamic impacts from antenna-feeder equipment. The foundation should ensure stability, accurate positioning and stable operation of the mast throughout the entire service life.

Piles for telecommunication masts

Screw piles are deepened to the bearing layers of the soil, ensuring the transfer of loads from the mast and equipment to stable horizons. The absence of concreting allows you to implement foundations in hard-to-reach and remote locations without large-scale preparatory work.

Engineering approach

The foundation for the communication mast is calculated individually taking into account the height of the structure, the type of mast, the number and weight of antennas, wind and climatic loads, as well as the real soil conditions of the site.

Constructive solution

The screw foundation allows you to integrate piles with mast support units and carry out the installation of a telecommunications facility without waiting for a set of concrete strength.

ADVANTAGES OF THE FOUNDATION ON SCREW PILES FOR COMMUNICATION MASTS

The foundation on screw piles is an engineering-based solution for telecommunication infrastructure due to fast installation, stable geometry and adaptation to difficult conditions.
Screw piles are installed in a short time, which allows you to quickly put communication objects into operation.
Piles are calculated taking into account wind loads and impacts from antenna equipment.
The absence of pits and concreting reduces interference with the natural environment and accelerates the restoration of the site.
The ability to install without heavy equipment allows the implementation of communication masts in remote, mountainous and swampy areas.
Screw piles are not affected by temperature fluctuations, which is important for the continuous expansion of telecommunications networks.

FOUNDATION ENGINEERING CRITERIA FOR COMMUNICATION MASTS

CRITERION 1

ESTIMATED IMMERSION DEPTH

Determined by the results of geotechnical surveys and requirements for the stability of the mast.
CRITERION 2

ADAPTATION TO THE SOIL CONDITIONS OF THE SITE

CRITERION 2

ADAPTATION TO THE SOIL CONDITIONS OF THE SITE

The foundation is designed taking into account the actual operation of soils under combined loads.
CRITERION 3

BEARING CAPACITY UNDER MAST AND EQUIPMENT

CRITERION 3

BEARING CAPACITY UNDER MAST AND EQUIPMENT

Piles are calculated for loads from the mast structure and antenna-feeder systems.

CRITERION 3

BEARING CAPACITY UNDER MAST AND EQUIPMENT

CRITERION 3

BEARING CAPACITY UNDER MAST AND EQUIPMENT

Piles are calculated for loads from the mast structure and antenna-feeder systems.
CRITERION 4

PRECISE GEOMETRY AND STABILITY OF THE STRUCTURE

Ensures the correct position of the mast and stable operation of the equipment.
CRITERION 4

PRECISE GEOMETRY AND STABILITY OF THE STRUCTURE

Ensures the correct position of the mast and stable operation of the equipment.
CRITERION 5

LACK OF SHRINKAGE

Installation without concreting minimizes the risks of distortions and deformations during operation.
Get expert advice online
Installation Steps
Geology and construction design

For the correct design of the foundation, engineering and geological surveys and analysis of the design of the structure are carried out. This allows you to determine the design loads, soil conditions, the depth of the bearing layers and the requirements for the geometry of the foundation system.

ADAPTATION OF THE FOUNDATION FOR THE STRUCTURE

Based on the data obtained, PILLAR engineers calculate the number of supports, the step of their location and the depth of immersion. The parameters of the geo-groups are selected taking into account the loads, the type of structure and the required geometric stability of the foundation.

INSTALLATION AND READINESS FOR CONSTRUCTION

Screw piles are installed with control of verticality, torque and geometry of the foundation field. After completion of installation, the foundation is immediately ready for further construction of the structure without technological pauses and waiting for shrinkage.

Get a response
from our manager today!
COMPLETED PROJECTS
Here are examples of completed projects that showcase our engineering approach and technical expertise.
All articles
Get a response
from our manager today!
Отримайте відповідь
від нашого менеджера сьогодні!