Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.

Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.
An industrial building subjected to permanent loads from the steel framework, roof, racking systems, and stored goods, as well as potential local and variable loads. The foundation must ensure stability, precise geometry, and deformation control throughout the building’s service life.
Screw piles are driven into load-bearing soil layers, transferring loads from columns, the structural framework, and warehouse equipment to stable strata. The absence of excavations and concrete works preserves the geometry of the foundation grid, which is critical for the installation of racking systems and logistics infrastructure.
The foundation for a warehouse is designed individually, taking into account the type of warehouse (logistics, cold storage, high-rack), storage loads, and the actual soil conditions of the site.
Screw pile foundations allow integration of piles with steel structure connection points and enable rapid installation of the framework and internal warehouse systems without waiting for concrete to cure.
Design embedment depth
Adaptation to soil conditions
ADAPTATION TO SOIL CONDITIONS
Load-bearing capacity for columns and racking systems
LOAD-BEARING CAPACITY FOR COLUMNS AND RACKING SYSTEMS
НЕСУЧА ЗДАТНІСТЬ ПІД КОЛОНИ ТА СТЕЛАЖІ
НЕСУЧА ЗДАТНІСТЬ ПІД КОЛОНИ ТА СТЕЛАЖІ
ТОЧНА ГЕОМЕТРІЯ ФУНДАМЕНТНОГО ПОЛЯ
Precise foundation grid geometry
No settlement
For proper foundation design, geotechnical engineering surveys and structural design analysis are performed. This allows for determining the design loads, soil behavior conditions, the depth of load-bearing soil layers, and the geometric requirements of the foundation system.
Based on the obtained data, PILLAR engineers calculate the number of supports, their spacing, and the installation depth. The parameters of the geoscrews are selected considering the loads, structure type, and required geometric stability of the foundation.
Screw piles are installed with strict control of vertical alignment, torque, and foundation field geometry. Upon completion of installation, the foundation is immediately ready for further structure erection—with no technological downtime and no waiting for shrinkage.