Entrust your project to us and receive comprehensive engineering support for your foundation—from design calculations to installation, with quality control at every stage.

Entrust your project to us and receive comprehensive engineering support for your foundation—from design calculations to installation, with quality control at every stage.
Garages generate localized and dynamic loads, so the foundation must ensure stability and precise geometry without settlement. Screw foundations are a structurally sound solution for garage structures.
Screw piles are driven into the load-bearing soil layers, ensuring the foundation remains stable on various types of subsoil. This helps maintain the structural integrity of the foundation beneath the floor and gate.
PILLAR performs structural calculations for garage foundations, taking into account the structure's weight and operational loads. We select ground anchors and ensure that the foundation complies with the design specifications.
For garages, a screw pile foundation provides a stable base that is resistant to settlement and deformation. The piles are integrated with the foundation grid or the structure’s metal framing.
Optimal foundation depth
Adaptation
to the soil type
Adaptation to the soil type
DESIGN LOAD-BEARING CAPACITY
DESIGN LOAD-BEARING CAPACITY
РОЗРАХУНКОВА НЕСУЧА ЗДАТНІСТЬ
РОЗРАХУНКОВА НЕСУЧА ЗДАТНІСТЬ
ТОЧНА ГЕОМЕТРІЯ ФУНДАМЕНТУ
PRECISE FOUNDATION GEOMETRY
INSTALLATION WITHOUT STRUCTURAL SETTLEMENT
To ensure the proper design of the foundation, engineering-geological surveys are conducted and the building design is analyzed. This allows for the determination of design loads, soil conditions, the depth of the bearing layers, and the geometric requirements for the foundation system.
Based on the data obtained, PILLAR engineers calculate the number of piles, their spacing, and their embedment depth. The parameters of the ground anchors are selected taking into account the loads, the type of structure, and the required geometric stability of the foundation.
Screw piles are installed with careful monitoring of verticality, torque, and the geometry of the foundation grid. Once installation is complete, the foundation is immediately ready for further construction without any delays or waiting for settlement.