Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.

Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.
Gates and fences are linear structures that are sensitive to distortions and wind loads, so the foundation must provide rigid fixation of supports. Screw foundations are a structurally sound solution for such systems.
Screw piles are deepened to the bearing layers of the soil, ensuring stable operation of the supports in various soil conditions. This preserves the verticality of the posts and the exact geometry of the railing line.
PILLAR performs engineering calculation of foundations for gates and fences considering loads from webs and wind impacts. We select geo-groups and ensure compliance with the project foundation.
For gates and fences, the screw foundation forms a stable base without shrinkage and seasonal deformations. Piles are integrated with metal or combined structural supports.
Optimal foundation depth
Adaptation
to soil type
Adaptation to soil type
DESIGN BEARING CAPACITY
DESIGN BEARING CAPACITY
РОЗРАХУНКОВА НЕСУЧА ЗДАТНІСТЬ
РОЗРАХУНКОВА НЕСУЧА ЗДАТНІСТЬ
ТОЧНА ГЕОМЕТРІЯ ОПОР
EXACT GEOMETRY OF SUPPORTS
INSTALLATION WITHOUT SHRINKAGE OF THE STRUCTURE
For the correct design of the foundation, engineering and geological surveys and analysis of the design of the structure are carried out. This allows you to determine the design loads, soil conditions, the depth of the bearing layers and the requirements for the geometry of the foundation system.
Based on the data obtained, PILLAR engineers calculate the number of supports, the step of their location and the depth of immersion. The parameters of the geo-groups are selected taking into account the loads, the type of structure and the required geometric stability of the foundation.
Screw piles are installed with control of verticality, torque and geometry of the foundation field. After completion of installation, the foundation is immediately ready for further construction of the structure without technological pauses and waiting for shrinkage.