For the project, a screw pile foundation with a metal frame was used, which allowed:
Site and terrain analysis Height differences and conditions for structure placement were assessed.
Design of the foundation and frame A custom solution was developed taking into account the loads and geometry of the slide.
Fabrication of elements Screw piles, extensions, diagonal braces, and metal frame were prepared.
Installation of the foundation system 62 screw piles were installed with monitoring of geometry and levels.
Finishing works Fencing and safety elements were installed, and the base for the decking was prepared.
as it was necessary to quickly implement a reliable foundation for the tubing slide on complex terrain.