For the object, a screw pile foundation was applied, which allowed:
Engineering site survey Analysis of the groundwater level and assessment of the feasibility of using screw piles.
Foundation design Calculation of the placement scheme for 28 ground screws in accordance with the house layout.
Ground screw production Preparation of supports in accordance with design parameters.
Foundation installation Installation of ground screws with monitoring of depth, verticality, and elevation marks.
because an engineering solution was needed for building a house in conditions of high groundwater levels.