For the facility, a screw pile foundation was chosen, which allowed:
Engineering site assessment An inspection of the column installation sites was conducted, taking into account the existing landscape and finished architectural solutions.
Project preparation A screw foundation solution was developed with reference to the geometry of the columns and the specified structural parameters.
Production of piles A set of screw piles has been prepared according to the design quantity and loads.
Delivery and installation The installation of 24 ground screws was carried out without the use of heavy machinery and without damaging the landscape.
Completion and handover The finished foundation base has been handed over for the subsequent installation of the wooden columns.
As an engineering solution with fast installation and controlled reliability was required.
As an engineering solution with fast installation and controlled reliability was required.