SCREW FOUNDATION FOR WOODEN COLUMNS IN DOBROPARK

Location
Motyzhyn, Kyiv region
Date
November 2021
Terms:
2 working days
Ground screws
24 pcs
Object type
Wooden columns (landscape object)
Challenges
The foundation implementation was carried out within a landscaped area with an already formed landscape and finished architectural solutions, which required:
SELECTION CRITERIA
FOR THE ENGINEERING SOLUTION
Execution deadlines, minimal landscape interference, and compatibility with existing structural solutions.
Adopted Engineering Solution
For the facility, a screw pile foundation was chosen, which allowed:
The foundation project was developed taking into account already existing architectural and structural solutions, spatial references of the supports, and the object's operating conditions.
РЕАЛІЗОВАНІ РІШЕННЯ
Інженери PILLAR
розробили проєкт палійно-
гвинтового фундаменту
Який ідеально підходить

Конструкція:

For the facility, a screw pile foundation was chosen, which allowed:

Тип паль:

Навантаження:

Особливості монтажу
Implementation Process
Engineering site assessment

An inspection of the column installation sites was conducted, taking into account the existing landscape and finished architectural solutions.

A screw foundation solution was developed with reference to the geometry of the columns and the specified structural parameters.

A set of screw piles has been prepared according to the design quantity and loads.

The installation of 24 ground screws was carried out without the use of heavy machinery and without damaging the landscape.

The finished foundation base has been handed over for the subsequent installation of the wooden columns.

Result
The use of a screw foundation allowed for the implementation of the project within tight deadlines, with minimal interference with the landscaped area and in compliance with the approved architectural solutions:
That is why the client turned to PILLAR

As an engineering solution with fast installation and controlled reliability was required.

That is why the client turned to PILLAR

As an engineering solution with fast installation and controlled reliability was required.

IMG_2940-1IMG_2946
Документація проекту
ВІДГУК КЛІЄНТА
PILLAR Implemented Solutions
Here are examples of completed projects that demonstrate our engineering approach and technical expertise.
Get a response
from our manager today!
All articles
Get a response
from our manager today!
Отримайте відповідь
від нашого менеджера сьогодні!