For the project, a pile-screw foundation was used, which allowed for:
Engineering Assessment of the Site Analysis of soil conditions and water saturation levels.
Foundation Design Calculation of the layout for 85 ground screws according to the building floor plan.
Production of Ground Screws Preparation of supports according to design parameters and operating conditions.
Foundation Installation Installation of ground screws with control over immersion depth, verticality, and elevation levels.
a fast, concrete-free solution was required for a SIP house in water-saturated soils.
a fast, concrete-free solution was required for a SIP house in water-saturated soils.