Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.

Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.
Engineering structures equipped with lamps, solar panels, batteries and control modules operating independently of centralized power grids. The foundation should ensure the stability of the support, the exact vertical position and reliable operation of the equipment throughout the entire service life.
Screw piles are deepened to the bearing layers of the soil, providing the transfer of loads from the support, lamps and photovoltaic modules to stable horizons. The absence of concreting allows you to quickly implement foundation solutions even in hard-to-reach or remote locations.
The foundation for self-contained lighting supports is calculated taking into account the height of the support, the weight of the equipment, wind loads, the sails of the solar panels and the actual soil conditions of the site.
The screw foundation allows you to integrate piles with the supporting part of the lighting structure and perform the installation of supports without waiting for a set of concrete strength.
ESTIMATED IMMERSION DEPTH
ADAPTATION TO SOIL CONDITIONS
ADAPTATION TO SOIL CONDITIONS
BEARING CAPACITY FOR SUPPORT AND EQUIPMENT
BEARING CAPACITY FOR SUPPORT AND EQUIPMENT
НЕСУЧА ЗДАТНІСТЬ ПІД ОПОРУ ТА ОБЛАДНАННЯ
НЕСУЧА ЗДАТНІСТЬ ПІД ОПОРУ ТА ОБЛАДНАННЯ
ТОЧНА ВЕРТИКАЛЬНІСТЬ ОПОРИ
EXACT VERTICALITY OF THE SUPPORT
LACK OF SHRINKAGE
For the correct design of the foundation, engineering and geological surveys and analysis of the design of the structure are carried out. This allows you to determine the design loads, soil conditions, the depth of the bearing layers and the requirements for the geometry of the foundation system.
Based on the data obtained, PILLAR engineers calculate the number of supports, the step of their location and the depth of immersion. The parameters of the geo-groups are selected taking into account the loads, the type of structure and the required geometric stability of the foundation.
Screw piles are installed with control of verticality, torque and geometry of the foundation field. After completion of installation, the foundation is immediately ready for further construction of the structure without technological pauses and waiting for shrinkage.