For the project, a screw pile foundation combined with a steel grillage was used, which allowed:
Engineering survey of the site Analysis of water zone conditions, terrain, and height differences.
Design of the foundation system A solution was developed taking into account the circular geometry and operational loads.
Fabrication of metal structures In-house production of the steel grillage and structural elements (10 t).
Installation of screw piles and grillage 136 screw piles were installed with monitoring of levels and geometry.
Completion of works The site was prepared for further development and operation.
as it was necessary to implement a complex foundation solution in a water zone with high geometric precision, reliability, and a full cycle of fabrication and installation.