For the site, a foundation on ground screws was applied, which allowed:
Інженерне обстеження ділянки Soil conditions and loads from the metal structure were analyzed.
Foundation design An individual solution has been developed, taking into account peat soils.
Production of piles Screw piles with precise design parameters were manufactured in-house.
Foundation installation Installation of 24 geo-groups with verticality and elevation control was performed.
Coordination of works The coordinated work of design, production and installation is ensured.
The client turned to PILLAR because it was necessary to implement a precise and reliable foundation for the cellular tower on weak soils within tight deadlines.