For the facility, a ground screw foundation was applied, which allowed to:
Design Development of the layout for 24 ground screws, taking into account the canopy configuration.
Production Preparation of ground screws according to the design characteristics.
Installation Rapid installation of supports with verticality and level control.
because they required a rapid solution without concrete and the possibility of registering the canopy as a temporary structure.
because they required a rapid solution without concrete and the possibility of registering the canopy as a temporary structure.