For the project, a screw pile foundation (ground screws) was applied, which allowed for:
Design Development of the layout scheme for 52 ground screws, taking into account the conveyor route and utility corridors.
Manufacturing Preparation of ground screws in accordance with the calculated loads and design parameters.
Installation Vibration-free installation of supports in winter conditions with control of verticality and elevations.
as they required a vibration-free, concrete-less solution for winter installation near utilities without shutting down the pellet plant.
as they required a vibration-free, concrete-less solution for winter installation near utilities without shutting down the pellet plant.
