A screw-pile foundation was chosen for the project, which made it possible to:
Engineering Assessment of Conditions An evaluation of the seabed soils and installation conditions in a water environment was conducted.
Project Preparation A screw-pile foundation design was developed, aligned with the pier’s geometry and the water level.
Pile Fabrication A set of screw piles was prepared according to the design specifications.
Delivery and Installation The installation of 22 ground screws was completed in 2 working days, with careful monitoring of vertical alignment and secure anchoring of the supports.
Completion and Handover The completed foundation base was handed over for the subsequent installation of the pier.
as an engineering solution was required for the rapid installation of a pier in water with stable anchoring of the supports.