A screw pile foundation with a steel grillage was used for the project, which made it possible to:
Site Engineering Assessment Soil condition and humidity level were analyzed.
Foundation design A project adapted to the conditions of high humidity and the geometry of the terrace has been developed.
Fabrication of elements Prepared geoshurgroups, metal grillage and hinge units of its own production.
Site Engineering Assessment Installation of 83 ground screws was completed with the installation of the grillage and fastening joints.
Base Transfer The foundation is prepared for further installation of the pool terrace.
because it was necessary to implement a reliable foundation for the pool terrace in water-saturated soils with fast installation and optimized cost.