The optimal solution was a ground screw foundation, which made it possible to:
Design Development of the layout for 12 ground screws, taking into account the conditions of installation in water.
Production Preparation of ground screws according to the design parameters.
Installation Rapid installation of supports with depth and verticality control.
because they required the rapid construction of a pier in water without concrete, heavy machinery, or impact on the shoreline.
because they required the rapid construction of a pier in water without concrete, heavy machinery, or impact on the shoreline.
