PIER WITH A STAGE ON THE WATER IN DNIPROPETROVSK REGION

Location
Dnipro city
Date
February 2016
Terms:
3 working days
Ground screws
36 pcs
Object type
Pier with a stage structure on the water
Challenges
The project implementation was complicated by the specifics of the aquatic environment and tight deadlines:
SELECTION CRITERIA
FOR THE ENGINEERING SOLUTION
Foundation installation in water without concrete, featuring high speed and structural stability.
Adopted Engineering Solution
To implement the project, a ground screw foundation was chosen, which made it possible to:
The foundation was designed taking into account the dynamic loads from the stage structure and the operation of the facility.
РЕАЛІЗОВАНІ РІШЕННЯ
Інженери PILLAR
розробили проєкт палійно-
гвинтового фундаменту
Який ідеально підходить

Конструкція:

To implement the project, a ground screw foundation was chosen, which made it possible to:

Тип паль:

Навантаження:

Особливості монтажу
Implementation Process
Design

Development of the layout for 36 ground screws, taking into account aquatic conditions and load requirements.

Preparation of ground screws according to the design parameters.

Rapid installation of supports in water with control of verticality and elevation marks.

Result
As a result of the work performed:
That is why the client turned to PILLAR

because they required rapid construction of a foundation in water without concrete, with guaranteed stability under stage loads.

That is why the client turned to PILLAR

because they required rapid construction of a foundation in water without concrete, with guaranteed stability under stage loads.

IMG_46588-1
Документація проекту
ВІДГУК КЛІЄНТА
PILLAR Implemented Solutions
Here are examples of completed projects that demonstrate our engineering approach and technical expertise.
Get a response
from our manager today!
All articles
Get a response
from our manager today!
Отримайте відповідь
від нашого менеджера сьогодні!