A pile-screw foundation was chosen for the project, which allowed to:
Engineering Assessment of the Site The topography was analyzed, and elevation points for pile placement were determined.
Project Preparation A pile-screw foundation design was developed, taking into account the elevation differences and the house geometry.
Pile Production A set of ground screws was prepared in accordance with the project specifications.
Delivery and Installation Seventy-eight ground screws were installed in 3 working days with strict control of vertical alignment and elevation marks.
Completion and Handover The completed foundation was handed over for the installation of the SIP panel house.
they required an engineering solution for accurate installation of a SIP panel house on a sloped site.
they required an engineering solution for accurate installation of a SIP panel house on a sloped site.