For the object, a screw pile foundation was applied, which allowed:
Engineering site survey Assessment of the terrain, access conditions, and installation possibilities during the winter period.
Foundation design Calculation of the placement scheme for 27 ground screws, taking into account elevation changes and loads.
Ground screw production Preparation of supports in accordance with design solutions.
Foundation installation Installation of ground screws with monitoring of elevation marks and geometry without the use of wet processes.