For the object, a screw pile foundation was applied, which allowed:
Engineering soil assessment Analysis of water saturation and determination of the peat layer depth.
Foundation design Calculation of lengths and the placement scheme for 29 ground screws to ensure the required load-bearing capacity.
Ground screw production Preparation of supports according to design parameters.
Foundation installation Installation of ground screws with monitoring of immersion depth, verticality, and elevation marks.
as a solution was needed for water-saturated soils with peat, ensuring rapid installation and the stability of the log structure.
as a solution was needed for water-saturated soils with peat, ensuring rapid installation and the stability of the log structure.
