For the object, a pile-screw foundation was used, which allowed for:
Engineering assessment of the site Analysis of soils and determination of the possibility of using screw piles on a landslide-prone site.
Foundation design Calculation of the layout for 30 ground screws according to the house floor plan.
Production of ground screws Preparation of supports according to the project parameters.
Foundation installation Installation of ground screws with control over immersion depth, verticality, and elevation levels.
a fast, concrete-free solution was required for a SIP house on landslide-prone soil.
a fast, concrete-free solution was required for a SIP house on landslide-prone soil.
