A ground screw foundation was used for the reconstruction, which allowed to:
Design Development of reconstruction schemes and layout for 112 ground screws, taking into account existing utility networks.
Production Manufacturing of ground screws in accordance with design loads and technical requirements.
Installation Rapid installation of supports with control over the geometry and verticality of the foundation.
because they required the rapid reconstruction of power transmission tower foundations within a densely built-up area and under high groundwater conditions.
because they required the rapid reconstruction of power transmission tower foundations within a densely built-up area and under high groundwater conditions.