For the object, a screw pile foundation was applied, which allowed:
Engineering site assessment Analysis of hydrogeological conditions and site zoning for three buildings.
Foundation engineering Development of ground screw placement schemes, taking into account the loads and layout of each house.
Ground screw production Preparation of 238 supports according to design parameters.
Foundation installation Step-by-step installation of ground screws with monitoring of depth, verticality, and elevation marks.