A screw pile foundation was selected for the project, which allowed:
Engineering site assessment The assessment of soil conditions and moisture levels of the construction site has been conducted.
Project preparation The screw pile foundation project was developed taking into account the loads from residential houses and year-round operation conditions.
Production of piles A set of screw piles has been prepared according to the project parameters and quantity.
Delivery and installation The installation of 117 ground screws was completed in 2 working days with verticality and level control.
Completion and handover The finished foundation base has been handed over for the further construction of energy-efficient residential houses.