For the project, a ground screw foundation was chosen, which made it possible to:
Production Preparation of 100 ground screws according to the design parameters.
Installation Rapid installation of supports with depth and verticality control, forming a level foundation plane.
because they required the rapid construction of a hangar foundation in winter without concrete work or technological pauses.