A pile-screw foundation was chosen for the project, which allowed to:
Engineering Assessment of the Site An analysis of the slope’s topography was conducted, and the design elevations and pile installation points were determined.
Foundation System Design A layout of the ground screws was developed, taking into account the elevation differences and terrace geometry.
Ground Screw Production The screws were manufactured in accordance with the project specifications.
Foundation Installation Seventy-three ground screws were installed with strict control of vertical alignment and elevation marks.
Terrace Installation Preparation The foundation was handed over for the subsequent installation of the above-ground structure.
they required an engineering solution for installing a public terrace on a slope with minimal impact on the landscape.
they required an engineering solution for installing a public terrace on a slope with minimal impact on the landscape.