A pile-screw foundation was chosen for the project, which allowed to:
Engineering Assessment of the Site The topography, elevation differences, and foundation placement conditions were analyzed.
Foundation Design A pile layout was developed, taking into account slope compensation and design elevations.
Ground Screw Production The screws were manufactured in accordance with the project specifications.
Foundation Installation Ninety ground screws were installed with strict control of vertical alignment and elevation marks.
Preparation for House Installation The foundation was handed over for the subsequent assembly of the SIP house kit.
they required an engineering solution for fast and precise preparation of the SIP house base on a sloped site.