For the object, a pile-screw foundation was used, which allowed:
Engineering survey of the site Assessment of the existing foundation condition, relief, and soil conditions.
Foundation design Calculation of the layout for 82 ground screws, taking into account the elevation changes and the structural design of the house.
Production of ground screws Preparation of supports according to the project parameters.
Foundation installation Installation of ground screws with control of depth, verticality, and levels without interference with the existing structure.
as a fast solution was needed without dismantling the old foundation on subsiding soils.
as a fast solution was needed without dismantling the old foundation on subsiding soils.