To implement the facility, a screw pile foundation based on ground screws was selected, which allowed for:
Design Development of an engineering solution taking into account the terrain, hydrogeological conditions, and the architectural concept of the bridge.
Manufacturing Preparation of 124 ground screws in accordance with the design parameters and operational conditions.
Installation Step-by-step installation of piles with precise control over elevation marks and structural geometry, ensuring no disruption to the surrounding landscape.
as they required an engineering solution for bridge installation with minimal impact on the landscape.
as they required an engineering solution for bridge installation with minimal impact on the landscape.
