A screw pile foundation using ground screws was chosen for the facility, which allowed for:
Design Development of the layout scheme for 85 ground screws, taking into account the existing buildings and hydrogeological conditions.
Manufacturing Preparation of ground screws in accordance with the design parameters and winter installation conditions.
Installation Rapid installation of supports without vibrations or disruption to the operation of the active facility.
as they required a fast solution without concrete for winter work, without vibrations, and with a guarantee of stability on water-saturated soils.
as they required a fast solution without concrete for winter work, without vibrations, and with a guarantee of stability on water-saturated soils.