Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.

Trust us with your project and get full engineering support of the foundation - from calculations to installation with quality control at each stage.
Object with increased requirements for safety, stability and durability of structures. The foundation should ensure reliable fixation of game elements and preserve geometry throughout the entire service life.
Screw piles are deepened to stable layers of soil, providing reliable transmission of loads from slides, swings, loopholes and canopies. The absence of concreting reduces the risks of cracks, distortions and repeated repairs of the coating.
The foundation for the playground is calculated taking into account the dynamic loads, the frequency of use of equipment and the actual soil conditions of the site.
The screw foundation allows you to accurately install the supports of the game structures and install the equipment without waiting for a set of concrete strength.
ESTIMATED IMMERSION DEPTH
ADAPTATION TO SOIL CONDITIONS
ADAPTATION TO SOIL CONDITIONS
BEARING CAPACITY FOR GAMING EQUIPMENT
BEARING CAPACITY FOR GAMING EQUIPMENT
НЕСУЧА ЗДАТНІСТЬ ПІД ІГРОВЕ ОБЛАДНАННЯ
НЕСУЧА ЗДАТНІСТЬ ПІД ІГРОВЕ ОБЛАДНАННЯ
ТОЧНА ГЕОМЕТРІЯ ВСТАНОВЛЕННЯ
PRECISE GEOMETRY OF THE INSTALLATION
LACK OF SHRINKAGE
For the correct design of the foundation, engineering and geological surveys and analysis of the design of the structure are carried out. This allows you to determine the design loads, soil conditions, the depth of the bearing layers and the requirements for the geometry of the foundation system.
Based on the data obtained, PILLAR engineers calculate the number of supports, the step of their location and the depth of immersion. The parameters of the geo-groups are selected taking into account the loads, the type of structure and the required geometric stability of the foundation.
Screw piles are installed with control of verticality, torque and geometry of the foundation field. After completion of installation, the foundation is immediately ready for further construction of the structure without technological pauses and waiting for shrinkage.