Home / SIP-panel homes

SIP-Panel Homes

A reliable foundation for SIP homes with precise geometry and no settlement. PILLAR screw foundations provide a stable base for rigid SIP structures without the need for concrete.
FULL ENGINEERING CYCLE FROM PILLAR
From concept to finished solution!

Entrust your project to us and receive comprehensive engineering support for your foundation—from design calculations to installation, with quality control at every stage.

From concept to finished solution!

Entrust your project to us and receive comprehensive engineering support for your foundation—from design calculations to installation, with quality control at every stage.

Engineering design of screw pile foundations, taking into account site geology, design loads, and project requirements. We select the type, diameter, and depth of the screw piles, ensuring precise geometry of the foundation grid and reliable performance of the foundation.
In-house production of ground anchors with quality control at every stage—from steel selection to corrosion protection. The products meet design load requirements, durability standards, and operational standards for foundation systems.
Professional installation of ground anchors in accordance with the design specifications and with torque control. The foundations are installed without concrete pouring or excessive excavation, which helps reduce construction time and optimize costs.

SCREW FOUNDATIONS FOR SIP PANEL HOMES

SIP-panel house

SIP houses have a rigid structure and distribute loads evenly across the foundation, so the foundation must ensure precise geometry and stability without settling. Screw piles are an engineering-wise solution for SIP technology, providing a reliable foundation without wet processes or production downtime.

Piles for a SIP house

Screw piles penetrate down to the load-bearing soil layers, ensuring the foundation’s stability on various types of subsoil, including weak and water-saturated soils. The absence of excavation pits and concrete pouring allows for the precise geometry of the foundation grid to be maintained, which is critical for the installation of SIP panels.

PILLAR

PILLAR performs structural calculations for the foundations of SIP homes, taking into account the site’s geology and the loads from the panels. We select ground anchors and ensure that the foundation meets the requirements of SIP technology.

Screw pile foundation

For SIP homes, a screw pile foundation is a structurally sound solution that ensures stability and precise geometry without settlement. The piles are integrated into the framing, allowing construction to begin immediately.

Advantages of a foundation on screw piles

A foundation on screw piles is an engineering-based solution for SIP homes, as it ensures stable foundation geometry, eliminates settlement, and guarantees predictable structural performance. This type of foundation allows SIP projects to be completed quickly, without concrete pouring and with minimal soil disturbance.
Installing a single ground screw takes up to 15 minutes, including checks for verticality and torque. Since there is no shrinkage, the installation of SIP structures can begin immediately after the foundation is laid.
Galvanized screw piles are designed for use in damp and water-saturated soils. Their corrosion protection ensures the foundation’s durability and the stability of its performance characteristics under challenging conditions.
Screw foundations allow the foundation to be precisely adapted to complex terrain and elevation changes without the need for extensive earthwork. This ensures the correct geometry of the foundation grid for the installation of SIP panels.
Гвинтовий фундамент дозволяє точно адаптувати основу до складного рельєфу та перепадів висот без масштабних земляних робіт. Це забезпечує правильну геометрію фундаментного поля для монтажу SIP-панелей.
Монтаж пальово-гвинтового фундаменту виконується без котлованів і бетонних робіт, що мінімізує будівельне сміття та зберігає природний стан ділянки без додаткових витрат на підготовку.
The installation of a screw pile foundation is carried out without excavation or concrete work, which minimizes construction debris and preserves the natural state of the site without additional preparation costs.
Installing screw piles does not require heavy equipment or complex preparatory processes. Controlling the foundation geometry ensures precise integration with the bottom framing of SIP structures.
Unlike concrete foundations, the installation of screw piles is not affected by temperature fluctuations. This allows foundation work for SIP houses to be carried out at any time of year without any technical limitations.

ENGINEERING CRITERIA FOR FOUNDATIONS IN SIP HOUSES

CRITERION 1

Optimal foundation depth

The depth of pile penetration is determined by engineering-geological surveys and the depth of the load-bearing soil layers.
CRITERION 2

Adaptation
to soil type

CRITERION 2

Adaptation to soil type

The foundation for a SIP house is adapted to the actual soil conditions, ensuring that loads are transferred to stable soil layers.
CRITERION 3

DESIGN LOAD-BEARING CAPACITY

CRITERION 3

DESIGN LOAD-BEARING CAPACITY

The load-bearing capacity of the foundation is determined by the loads from the SIP panels, floor slabs, and roof, with the necessary safety margin.
КРИТЕРІЙ 3

РОЗРАХУНКОВА НЕСУЧА ЗДАТНІСТЬ

Вимога 3

РОЗРАХУНКОВА НЕСУЧА ЗДАТНІСТЬ

Несуча здатність фундаменту визначається навантаженнями від SIP-панелей, перекриттів і покрівлі з необхідним запасом міцності.
КРИТЕРІЙ 4

ТОЧНА ГЕОМЕТРІЯ ФУНДАМЕНТУ

Для монтажу SIP-панелей фундамент повинен мати точну геометрію без відхилень по висоті та осях усіх опор.
CRITERION 4

PRECISE FOUNDATION GEOMETRY

For the installation of SIP panels, the foundation must have precise geometry with no deviations in height or alignment of all supports.
CRITERION 5

INSTALLATION WITHOUT STRUCTURAL SETTLEMENT

Screw foundations do not require concrete, which allows for the installation of SIP structures to begin immediately after installation.
Get expert advice online
Installation steps
Geology and Structural Design

To ensure the proper design of the foundation, engineering-geological surveys are conducted and the building design is analyzed. This allows for the determination of design loads, soil conditions, the depth of the bearing layers, and the geometric requirements for the foundation system.

ADAPTING THE FOUNDATION FOR THE STRUCTURE

Based on the data obtained, PILLAR engineers calculate the number of piles, their spacing, and their embedment depth. The parameters of the geopiles are selected taking into account the loads, the type of structure, and the required geometric stability of the foundation.

INSTALLATION AND READINESS FOR CONSTRUCTION

Screw piles are installed with careful monitoring of verticality, torque, and the geometry of the foundation grid. Once installation is complete, the foundation is immediately ready for further construction without any delays or waiting for settlement.

Get a response
from our manager today!
COMPLETED PROJECTS
Here are examples of completed projects that showcase our engineering approach and technical expertise.
All articles
Get a response
from our manager today!
Отримайте відповідь
від нашого менеджера сьогодні!