A pile-screw foundation was chosen for the project, which made it possible to:
Engineering Assessment of the Site An analysis of the slope’s topography was carried out, and the optimal pile installation points were identified.
Foundation Design A pile-screw foundation layout was developed, taking into account the elevation differences.
Geoscrew Production The geoscrews were manufactured in accordance with the project specifications.
Foundation Installation Twenty-five screw piles were installed with strict control of vertical alignment and elevation marks.
Construction Preparation The foundation was handed over for the subsequent construction of the café.
they required an engineering solution capable of enabling café construction on a slope with predictable foundation stability.