A ground screw foundation was selected for the reconstruction, which allowed to:
Design Development of reconstruction schemes and layout for 260 ground screws, taking into account urban constraints.
Production Manufacturing of ground screws in accordance with design parameters and loads.
Installation Rapid installation of supports with control over the verticality and geometry of the foundation.
because it was necessary to quickly and accurately replace the power transmission tower foundations in urban conditions and under high groundwater levels.
because it was necessary to quickly and accurately replace the power transmission tower foundations in urban conditions and under high groundwater levels.
