A screw pile foundation system was applied for the project, which allowed:
Site Engineering Survey Static soil tests and relief analysis were performed.
Foundation design An individual project has been developed taking into account the height difference and planning decisions of the building.
Production and supply 199 geo-groups up to 9.5 m long were manufactured and delivered.
Foundation installation Accurate marking, installation of piles and foundation system with verticality and elevation control were performed.
Reinforcement of the structure Extensions and diagonal connections were installed to increase the stability of the foundation.
because a foundation solution was needed on a complex terrain with fill soils and strict requirements for accuracy and deadlines.