For the object, a screw pile foundation was applied, which allowed:
Engineering preparation and design Development of the layout for 126 ground screws in accordance with the LSTK-frame configuration.
Production of ground screws Preparation of supports according to design parameters and operating conditions.
Foundation installation Step-by-step installation of ground screws with control of depth, verticality, and elevation marks.
as a solution was needed for water-saturated soils with peat, ensuring rapid installation and the stability of the log structure.
as a solution was needed for water-saturated soils with peat, ensuring rapid installation and the stability of the log structure.