For the object, a screw pile foundation was used, which allowed for:
Engineering site survey Assessment of soil conditions, moisture levels, and logistical constraints.
Foundation design Calculation of the layout for 58 ground screws, taking into account the house floor plan and load distribution.
Production of ground screws Preparation of supports in accordance with project parameters and operating conditions.
Foundation installation Installation of ground screws with monitoring of depth, verticality, and elevation marks without disturbing the natural state of the site.
a precise solution was required for a SIP house on water-saturated soils with winter installation and no concrete.
a precise solution was required for a SIP house on water-saturated soils with winter installation and no concrete.