Main / CEC Italy

GROUND-MOUNTED PV & AGRIVOLTAIC SYSTEMS · ENGINEERING + MANUFACTURING · ITALY

STEEL MOUNTING SYSTEMS FOR GROUND-MOUNTED PV AND AGRIVOLTAIC PROJECTS IN ITALY

Strutture in acciaio per impianti fotovoltaici a terra e agrivoltaici — progettazione, produzione e consegna in Italia.
Steel mounting structures and foundation solutions engineered as one system. Site-specific design based on project layout, geotechnical data, PV module configuration and structural loads.

delivered for

Get a technical proposal in 48 h

NDA on request · Your data is not shared · Reply within 1 business day
ENGINEERED FOR GROUND-MOUNTED PV AND AGRIVOLTAIC PROJECTS

Utility-scale solar parks

Commercial & industrial pv projects

Agrivoltaic projects

Energy communities and cer projects

From commercial ground-mounted installations to utility-scale solar parks. Fixed-tilt, East–West and agrivoltaic structures adapted to the site, PV modules and project loads.

FOUNDATION AND PV MOUNTING STRUCTURE ENGINEERED AS ONE SYSTEM

On a typical ground-mounted PV project, the foundation and mounting structure are often handled by other contractors, leaving responsibility for their interface unclear.

PILLAR engineers the ground screws and steel mounting structure as one system, using the same geotechnical data and load cases. Both components are manufactured and supplied as one coordinated package.

The result: fewer earthworks, no concrete curing, faster installation, a reversible foundation and one engineering team responsible for the full load path — from ground screw to PV module table.

Earthworks

Curing time

Installation time
per foundation

Winter installation

Winter
installation

Reversibility

Contractors involved

Concrete
footing

Excavation, formwork and concrete works

Typically 21–28 days

2–4 hours plus curing time

Weather and temperature restrictions

Demolition and disposal required

Often split across
suppliers

Earthworks

Curing time

Installation time
per foundation

Winter installation

Winter
installation

Reversibility

Contractors
involved

PILLAR ground
screw

One installation machine, minimal excavation

No concrete curing required

Typically 8–12 minutes*

Possible, subject to ground conditions

Unscrew, reuse or recycle

Foundation and structure engineered by PILLAR

GROUND-MOUNTED PV AND AGRIVOLTAIC SYSTEMS.
ONE ENGINEERING STANDARD
GROUND-MOUNTED PV AND AGRIVOLTAIC SYSTEMS. ONE ENGINEERING STANDARD

PV mounting structures engineered, manufactured and supplied by PILLAR — with the configuration, foundation system and technical parameters adapted to each project.

STANDARD 2V

Fixed-tilt mounting system for conventional ground-mounted PV projects.

BIFACIAL 2V

Mounting system for bifacial PV modules, designed to minimise rear-side shading.

2V EAST–WEST

Dual-orientation system designed for efficient land use and a balanced daily generation profile.

AGRIVOLTAIC — CUSTOM-ENGINEERED

Elevated steel structures adapted to agricultural activities, machinery and site conditions.

Foundation options: PILLAR ground screws, driven piles, concrete foundations or ROOT systems. Final configuration is selected according to geotechnical data, structural loads and project requirements.

GROUND-MOUNTED PV AND AGRIVOLTAIC PROJECTS
DELIVERED ACROSS EUROPE
GROUND-MOUNTED PV AND AGRIVOLTAIC PROJECTS DELIVERED ACROSS EUROPE
Structures and foundation systems engineered, manufactured and supplied by PILLAR — with project capacities, locations and scope of work you can explore in detail.
Structures and foundation systems engineered, manufactured and supplied by PILLAR — with project capacities, locations and scope of work you can explore in detail.
PILLAR in Italy

Exhibitor at KEY — The Energy Transition Expo

Rimini — one of Italy’s key renewable-energy events.
Meet the engineering team in person before you order.

Lorenzo Cagnoni Innovation Award

Recognised at KEY, Rimini, for an engineering solution contributing to the energy transition.

SUCCESSFUL SOLAR INSTALLATION

Seeing our engineering solutions come to life. Reliable ground-mounted solar structures installed across Italy.

EUROCODE DESIGN. SITE-SPECIFIC ENGINEERING. DOCUMENTATION FOR ITALIAN REVIEW.

Verification under NTC 2018 can be coordinated with a licensed Italian engineer appointed by the client or the client’s design team.

Own production. Capacity for utility-scale volumes

300,000

ground screws / year

up to 100 MW

of PV structures / month

10,000 t

year steel structures, Uzhhorod plant

EN 1090

Factory production control, hot-dip galvanised

Ground-mount reference

FVE Stonava, Czech Republic — 100 MW, structures and ground screws supplied by PILLAR

Full production cycle — cutting, bending, welding, galvanising, quality control. Plants in Uzhhorod and Dnipro, with OEM capacity in Turkey under PILLAR’s technical supervision. Steel from ArcelorMittal and POSCO.

Delivered to your site in Italy, customs cleared

Plant · Lviv, UA

Milano

Roma

Bari

Average 6 shipments per month to Italian sites. Last delivery: Brescia (BS), 11 days from order confirmation.

FROM PROJECT DATA TO STEEL ON SITE — IN FOUR STEPS

Clear project stages and confirmed timelines help you plan procurement and construction before placing the order.

01

Project data

Site layout, topographic and geotechnical data, PV module type and design loads. For AgriPV projects: crop requirements, operating clearances and agricultural machinery dimensions.
NDA available on request.

Day 0

02

Preliminary engineering & proposal

Structural concept, preliminary foundation solution, table configuration, scope of supply, budget and project schedule.

48–72 hours

03

Engineering & production

Site-specific structural calculations, foundation design, workshop drawings and manufacturing at PILLAR facilities. Steel structures produced in accordance with EN 1090.

4–6 weeks

04

Delivery & installation support

Delivery to your project site in Italy, coordinated with the construction schedule. Installation supervision or full installation by PILLAR crews is available upon request.

As scheduled

Send us your site layout — we will assess project feasibility, recommend a suitable mounting configuration and identify the data required for foundation design.

*Production time depends on project scope, technical requirements and order volume.

Preventivo preliminare in 72 ore

One form, one team, one answer. No call centre, no sequence of automated emails.

An engineer reads your layout

Same working day

You get a plan and a price range

Within 72 hours

We refine only if you want to

No follow-up pressure

Angela Berezovska

Parla italiano

Oleksandr Gostiev

Owner, PILLAR

We take the parking sites others walk away from

Angela Berezovska

Parla italiano

Oleksandr Gostiev

Owner, PILLAR

We take the parking sites others walk away from

Request a technical proposal

Subscribe to the newsletter

Or call / WhatsApp our Italian-speaking manager:  +39 00 000 0000 / +420 000 000 000

Questions we get before the first order

No — structure and foundation; compatible with any module

Far far away, behind the word mountains, far from the countries Vokalia and Consonantia, there live the blind texts. Separated they live in Bookmarksgrove right at the coast

Far far away, behind the word mountains, far from the countries Vokalia and Consonantia, there live the blind texts. Separated they live in Bookmarksgrove right at the coast

Far far away, behind the word mountains, far from the countries Vokalia and Consonantia, there live the blind texts. Separated they live in Bookmarksgrove right at the coast

Far far away, behind the word mountains, far from the countries Vokalia and Consonantia, there live the blind texts. Separated they live in Bookmarksgrove right at the coast

Far far away, behind the word mountains, far from the countries Vokalia and Consonantia, there live the blind texts. Separated they live in Bookmarksgrove right at the coast

Get a response
from our manager today!
Отримайте відповідь
від нашого менеджера сьогодні!