Home / Portfolio / SOLAR CARPORT MODEL BLADE, 333 KW, Drasov, Czech Republic

SOLAR CARPORT MODEL BLADE, 333 KW, Drasov, Czech Republic

Location
Drasov, Czech Republic
Date
2025
Solar power plant capacity
333 kW
Number of PV modules
564
Type of foundations
Ground screws
Customer
SIEMENS
Number of parking spaces
75
Carport model
Model BLADE / L та Y-type
Parking space width
2,500 mm
Snow load
1.61 kPa
Wind load
0.41 kPa (up to 26 m/s)
Object type
Commercial parking of the production complex
Challenges
The project was implemented on the existing territory of the production enterprise with high requirements for installation accuracy, safety and compliance with European standards.
The key challenges are:
SELECTION CRITERIA
FOR THE ENGINEERING SOLUTION
Compactness, compliance with EU and national standards, and reliability under increased loads.
Adopt the Engineering Solution
For the facility, BLADE Model solar carports in L and Y-type configurations on screw foundations (ground screws) with steel supporting structures were selected, which allowed:
The project was developed taking into account planning solutions for parking, traffic flows and conditions for the further operation of the facility.

РЕАЛІЗОВАНІ РІШЕННЯ

Інженери PILLAR
розробили проєкт палійно-
гвинтового фундаменту

Який ідеально підходить

Конструкція:

For the facility, BLADE Model solar carports in L and Y-type configurations on screw foundations (ground screws) with steel supporting structures were selected, which allowed:

Тип паль:

Навантаження:

Особливості монтажу

Implementation Process
Designing

The analysis of the terms of reference and planning solutions for parking was carried out. Model BLADE carport structures and screw foundations are calculated taking into account the design snow and wind loads and operating conditions. Prepared KMD project documentation for production.

 

Metal structures for the carports and screw foundations (ground screws) were manufactured in accordance with the design documentation, with anti-corrosion protection and RAL color coating.
Phased delivery of the structures and foundation elements to the construction site in the Czech Republic was ensured.

Geodetic marking, installation of screw foundations and metal structures of carports were performed. The work was carried out in stages without stopping the operation of the parking lot, in compliance with project bindings and safety requirements.

Result
As a result, an effective engineering solution was implemented for the commercial parking lot with solar energy generation:
That is why the client turned to PILLAR

Engineering solutions compliant with EU standards, experience in implementing carports of various configurations, and installation without concrete works at existing facilities.

That is why the client turned to PILLAR

Engineering solutions compliant with EU standards, experience in implementing carports of various configurations, and installation without concrete works at existing facilities.

02_402_6

Документація проекту

ВІДГУК КЛІЄНТА

PILLAR Implemented Solutions
Here are examples of completed projects that showcase our engineering approach and technical expertise.