Challenges
The project was implemented within an active commercial infrastructure and required solving a number of engineering and planning challenges:
SELECTION CRITERIA
FOR THE ENGINEERING SOLUTION
Ensuring rapid installation without concrete works and minimal impact on parking operations.
Adopt the Engineering Solution
For the facility, solar carports on ground screw foundations (geoscrews) with steel load bearing structures were chosen. This solution made it possible to:
The project was developed with regard to the parking layout and the facility’s operating conditions.

РЕАЛІЗОВАНІ РІШЕННЯ

Інженери PILLAR
розробили проєкт палійно-
гвинтового фундаменту

Який ідеально підходить

Конструкція:

For the facility, solar carports on ground screw foundations (geoscrews) with steel load bearing structures were chosen. This solution made it possible to:

Тип паль:

Навантаження:

Особливості монтажу

Implementation Process
Design

The technical specifications and parking layout solutions were analysed. The carport structures and ground screw foundations were designed for the specified climatic loads and operating conditions. Detailed design documentation (KMD) was prepared for production.

Steel structures and ground screw foundations were manufactured at PILLAR’s production facilities. Deliveries to site were scheduled in stages to match the installation sequence and minimise on‑site storage.

Ground screw foundations were installed without concrete works, followed by phased assembly of carport structures and PV modules. All work was carried out without interrupting the operation of the resort and hotel complex.

Result
As a result of the project, a fully functional carport complex was created and integrated into the existing infrastructure of the resort and hotel facility.
That is why the client turned to PILLAR

The client needed an engineering solution that combined installation speed with structural reliability under challenging conditions.

That is why the client turned to PILLAR

The client needed an engineering solution that combined installation speed with structural reliability under challenging conditions.

01_501_3

Документація проекту

ВІДГУК КЛІЄНТА

PILLAR Implemented Solutions
Here are examples of completed projects that showcase our engineering approach and technical expertise.
Get a response
from our manager today!
All articles
Get a response
from our manager today!
Отримайте відповідь
від нашого менеджера сьогодні!