Location
Buftea, Romania
Date
2024
Solar power plant capacity
61 kW
Number of PV modules
114
Type of foundations
Concrete
Customer
RESTART ENERGY (проєкт для PORR)
Number of parking spaces
16
Carport model
Model W / L-type
Parking space width
2,750 mm
Snow load
2.0 kPa
Wind load
0.50 kPa
Object type
Infrastructure commercial parking
Challenges
The project was implemented within an infrastructure site with high requirements for operational reliability, drainage, and structural stability under extreme climatic loads.
Key challenges included:
SELECTION CRITERIA
FOR THE ENGINEERING SOLUTION
Compactness, compliance with EU and national standards, and reliability under increased loads.
Adopt the Engineering Solution
For this facility, Model W / L-type solar carports with steel load-bearing structures on concrete foundations were selected, which made it possible to:
The project was developed taking into account the operational conditions of the infrastructure facility and local regulatory requirements.

РЕАЛІЗОВАНІ РІШЕННЯ

Інженери PILLAR
розробили проєкт палійно-
гвинтового фундаменту

Який ідеально підходить

Конструкція:

For this facility, Model W / L-type solar carports with steel load-bearing structures on concrete foundations were selected, which made it possible to:

Тип паль:

Навантаження:

Особливості монтажу

Implementation Process
Designing

The technical assignment and site conditions have been analyzed. The design of carport Model W is calculated taking into account the estimated snow and wind loads. KMD project documentation has been prepared taking into account concrete foundations and engineering systems.

The metal structures of carports were manufactured in accordance with the design documentation with anti-corrosion protection. The delivery of structures and components to the construction site is provided in accordance with the work schedule.

Steel structures of carpets were installed on prepared concrete foundations. The work was carried out in compliance with project bindings, safety requirements and standards of infrastructure construction.

Result
As a result, a reliable engineering solution has been implemented for the infrastructure parking area with integrated solar generation and additional functional systems:
That is why the client turned to PILLAR

Engineering solutions compliant with EU standards, experience in implementing carports of various configurations, and installation without concrete works at existing facilities.

That is why the client turned to PILLAR

Engineering solutions compliant with EU standards, experience in implementing carports of various configurations, and installation without concrete works at existing facilities.

09_509_2

Документація проекту

ВІДГУК КЛІЄНТА

PILLAR Implemented Solutions
Here are examples of completed projects that showcase our engineering approach and technical expertise.
Get a response
from our manager today!
All articles
Get a response
from our manager today!
Отримайте відповідь
від нашого менеджера сьогодні!