For the facility, a screw-pile foundation was chosen, which allowed for:
Engineering preparation of the site Site analysis was conducted, and the layout for the industrial SPP foundations was developed.
Engineering the foundation system A unified screw-pile foundation design was developed for serial installation.
Production of piles The manufacture and logistics of 10,000 ground screws were ensured in accordance with the construction schedule.
Serial installation Installation was performed using a flow method with continuous control of verticality, depth, and design elevations.
Handover for SPP installation The foundation system was handed over for the subsequent installation of metal structures and solar panels.
Because a scalable foundation was required for a utility scale SPP with serial installation without concrete.
Because a scalable foundation was required for a utility scale SPP with serial installation without concrete.