A combined foundation solution based on driven piles and a ballast system was used for the project, which allowed for:
Site engineering preparation An analysis of the geological and layout conditions was carried out, and the optimal foundation placement scheme was determined.
Foundation system design Engineering calculations were carried out, and a solution using driven piles and a ballast system was developed.
Pile manufacturing The production and preparation of foundation elements were carried out in accordance with the project documentation.
Serial installation The foundations and metal structures were installed with control over geometry and project levels.
Handover for solar power plant installation The prepared structure was handed over for the final installation of the photovoltaic modules.