A screw pile foundation (ground screws) was chosen for the facility, which made it possible to:
Site preparation An analysis of soil conditions was conducted, and a foundation layout plan was developed, taking into account the agricultural logistics of the site.
Design of the foundation system Engineering calculations were performed, and the parameters of ground anchors for agrivoltaic structures were selected.
Pile manufacturing The construction of screw piles has been completed in accordance with the design documentation.
Серійний монтаж The foundations were installed with careful monitoring of verticality, embedment depth, and design elevations.
Delivery for installation of the SES The foundation system has been delivered for the subsequent installation of the mounting system and AGRO PV photovoltaic modules.
Because a carefully engineered foundation was needed for the 0.5 MW AGRO PV system with minimal soil impact and full quality control.
Because a carefully engineered foundation was needed for the 0.5 MW AGRO PV system with minimal soil impact and full quality control.